References and Other Related Articles


 

  1. Balasubramanian, P. and Alexander Tuzhilin (1996). Using query driven simulation for querying outcomes of business processes, Decision Support Systems, vol. 16, 275-295.
  2. Centeno, M. and C. Standridge (1991). Modeling manufacturing systems: an information base approach, Simulation Symposium.
  3. Drake, Glenn R. and Jeffrey Smith (1996). Simulation systems for real time planning scheduling and control, Proceedings of the 1996 Winter Simulation Conference, December, Coronado, CA..
  4. Drake, Glenn R. and Jeffrey Smith (1995). Simulation as a planning and scheduling tool for flexible manufacturing systems, Proceedings of the 1995 Winter Simulation Conference, December, Washington DC.
  5. Erickson, C., Vandenberge, A. and T. Mills (1987). Simulation, animation, and shop floor control, Proceeding of the 1987 Winter Simulation Conference, 649-652.
  6. Grabot, B., Blanc, J., and C. Binda (1996). A Decision Support System for Production Activity Control, Decision Support Systems 16, 87-110.
  7. Godwin, A. N. and D. Sandars (1995). Forcast Standards and Existing Databases, Factory 2000, IEE Conf. Publ. No. 398.
  8. Harmononosky, C. M. and S. F. Robohn (1991). Real-time scheduling in computer integrated manufacturing: A review of recent literature. International Journal of Computer Integrated Manufacturing, 4, 331-340.
  9. Jones, A., Rabelo, L., and Yuehwern, Y., 1995, A hybrid approach for real-time sequencing and scheduling. International Journal of Computer Integrated Manufacturing, 8, 145-154.
  10. Jones ...
  11. Moser, M. and Engell, S. (1992). Avoiding scheduling errors by partial simulation of the suture, Proceedings of the 31st Conference on Decision and Control, Tucson, Az., December.
  12. Prabhu, V. and Neil Duffie (1995). A distributed simulation approach for enabling cooperation between entities in heterarchical manufacturing systems, SPIE, vol. 2596, 234-242.
  13. Rogers, P., and Flanagan, M. (1991). On-Line simulation for real-time scheduling of manufacturing systems, Industrial Engineering, 23, 37-40.
  14. Smith, J. S., Wysk, R. A., Sturrock, D., Ramaswamy, S., Smith, G., and Joshi S. B. (1994), Discrete event simulation for shop floor control, Proceedings of the 1994 Winter Simulation Conference, December, Lake Buena Vista, FL, pp. 962-969.
  15. Smith, J. and Joshi, S. (1995). A shop floor controller class for computer-integrated manufacturing, Internationa,l Journal of Computer Integrated Manufacturing, Vol. 8, No. 5, 327-339.
  16. Smith, J. S. (1996). Design and implementation of FMS control software, Proceedings of the 1996 FAIM Conference, Atlanta, GA, May 1996.
  17. Smith, J. S. and Joshi, S. B. (1993). Message-based part state graphs (MPSG) for shop floor control, Proceedings of the 2nd IIE Research Conference, Los Angels, CA, May 26-28, 1993.
  18. Stecke ...
  19. Tautuo, L. and H. Pierreval (1995). Using evolutionary algorithms and simulation for the optimization of manufacturing systems, Emerging Technologies and Factory Automation INRIA/ IEEE Symposium.
  20. Thompson ...
  21. Tunali, S. (1995). Simulation for evaluating machine and AGV scheduling rules in an FMS environment, Engineering Management Conference, 433-438.
  22. Wu, D. S. and R. A. Wysk (1989). An application of discrete event simulation to on-line control and scheduling in flexible manufacturing, International Journal of Production Research, 27, 1603-1624.
  23. Wysk, R. A. and Smith, J. S. (1995). A formal functional characterization of shop floor control, Computers in Industrial Engineering, Vol. 28, No. 3, pp. 631-644.

 



This page maintained by Cynthia LaJimodiere.
The contents of this page were last modified on Monday, April 21, 1997.