Shop Floor Control System
Shop Floor Control System
Shop Floor Equipment
and Personnel
Higher Level Planning (e.g., MRP)
Orders
Products
Production requirements
for the current planning horizon
Production status
Previous slide
Next slide
Back to the first slide
View Graphic Version